I was on vacation got more sanding done still needs a coat or 2 of mud I suck at drywall. Got back me and Matt got the mixing barrels plumbed up. Was testing rodi to make water had a leak on the auto shutoff valve so just ordered that. Dry wall has to be finished before water so no dust falls in.
Sent from my iPad using Tapatalk