Purchased this set up from someone that needed to unload it fast. Was not happy at all with the way it was set up when I purchased it. Since it was up and running, I just moved it fast and tossed it back up. Currently running now with a HOB filter :( . This will be the plumbing set up for a 65 FOWLR tank for a few months until I can change things around the way I really want them (and finish Mom's tank and my 40b set up). I want to paint or stain the stand and canopy and espresso color, add a real sump, and put my GHoles overflow on (will be looking for someone to drill it for me) Aside from opinions on the skimmer (Urchin) selection (fits the space for now and was great on a 45 cube) do you see anything that should be changed before I cement it all together tomorrow night?
Using a CPR overflow (CS 50 I think)- down to the skimmer sock, water flows through sock where the MJ1200 skimmer pump is beneath it, water drops out of skimmer to the the Mag 7 return, return has a "T" which takes it to the tank and also back to the section between the filter sock and skimmer; which will hold some chaeto or caulerpa, there are holes in the right side of that section for water to flow back into the chamber that holds the return.
Not looking for anything fancy at this point, just something that works for a few months (or less) and makes sense.
Thoughts? Suggestions on changes before I cement?