Finally got one phase of power back after 36+ hours. Fortunately the tanks are on that phase. Hopefully the other phase gets turned back on so the AC kicks on.
Vortech back up only lasted for about 4 hours for 2 MP40s. Inverters running off 2 deep cycle marine optima batteries kept the vortechs and other powerheads going through out the night. In the morning I picked up gas and ice and hooked up my small inverter generator to run the controller, main circulation pump, powerheads, two part doser and fans. Ice helped knock the temp down when the fans weren't cutting it.
Hopefully nothing is too negatively effected. I was able to keep the temp between 78 and 80, but did notice a bit of an alk swing due to the two part doser being off for about 12 hours. Very glad I invested in a few forms of power outage equipment.
I can lend out my 2kW generator to anyone that is in desperate need as long as my power stays on.