Jump to content

Recommended Posts

So I'm doing the pluming on the new tank and I just can't seem to get the Nylon tubing over the barbed fitting. Yes.. it's the right size. It's such a tight fit I just don't want to have to put as much pressure on the bulkhead as I think I am going to have to. I was planning on dipping the ends of the Nylon tubing into some boiling water for a few seconds just before putting it over the barbed fittings. Is this advisable? Any other tips to installing Nylon tubing over a barbed fitting?

 

Thanks in advance.

They tend to fit very tightly. Be sure that you're looking at the ID of the tubing vs the size of the bulkhead (there are also OD measurements on the tubing, so be careful). The tubing should easily slip onto the tip of the barb. Getting it past the first 1/4" or so definitely requires some work. Definitely be careful about putting too much stress on the bulkhead.

I take a coffee cup of water and stick it in the microwave for 1min 45 seconds.

Then I hold the hose it for 15 seconds and gently push it onto my fitting.

cinchy

Yeah, I used a Caliper to measure the barbed end and just got the tube today.

 

Thanks... the coffee cup, water and microwave worked perfect!

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...