Jump to content

rlevy

WAMAS Member
  • Posts

    6
  • Joined

  • Last visited

Posts posted by rlevy

  1. I’m ready to upgrade from my 32gal biocube to something in the 150gal range.  Before doing that I need to add some more strength to the floor to carry the load.  This will be on our main floor, above a finished basement, running parallel to the joists.

     

    Any recommendations for a contractor for such a job?

     

    Also, any thoughts on whether it’s worthwhile to run plumbing while I am already putting holes in ceilings/walls?  My water station is in the basement but on the other end of the house.  Not having to carry buckets up the stairs is appealing.  Would you run 3 separate lines for salt, ato, and waste?

×
×
  • Create New...