I’m ready to upgrade from my 32gal biocube to something in the 150gal range. Before doing that I need to add some more strength to the floor to carry the load. This will be on our main floor, above a finished basement, running parallel to the joists.
Any recommendations for a contractor for such a job?
Also, any thoughts on whether it’s worthwhile to run plumbing while I am already putting holes in ceilings/walls? My water station is in the basement but on the other end of the house. Not having to carry buckets up the stairs is appealing. Would you run 3 separate lines for salt, ato, and waste?